UTILITY PLANT SOLUTIONS
  • Home
  • Utility Plant Solutions Store
  • Services
    • Start Up
    • Biomass
    • Steam and Boiler
    • Controls
    • Mechanical
    • Electrical
    • Training
    • Thermographic Inspections
    • Cooling Tower Cleaning
  • Projects
  • Products
    • Powermaster Boilers
    • GEM Traps
    • VAF Filters
  • Resources
  • Contact
Picture

Boiler Plant Expansion

Currently providing start-up services for the Operation of one 20KPPH HRSG, one 1900KW Siemens Steam Turbine Generator, and all associated plant equipment for the Water and Sewer Authority of Cabarrus County's Rocky River Waste Water Treatment Plant in Concord, NC.

The plant operations consist of processing human waste for incineration in a Multi-Hearth incinerator using the waste heat to generate 900 PSIG 850F steam for use in a Siemens Steam Turbine Generator. Activities consist of start-up and troubleshooting of new systems and equipment as well as controls integration to existing plant.

Work also includes operator training and SOP writing for plant operations. UPS has provided 24/7 support including temporary operations staff and on-site consulting. UPS has contracted with Acorn Industrial and WSACC for the services listed above.
Picture
Picture
Utility Plant Solutions® 1005 Hialeah Ct., Wake Forest, NC 27587
919-801-6452
  • Home
  • Utility Plant Solutions Store
  • Services
    • Start Up
    • Biomass
    • Steam and Boiler
    • Controls
    • Mechanical
    • Electrical
    • Training
    • Thermographic Inspections
    • Cooling Tower Cleaning
  • Projects
  • Products
    • Powermaster Boilers
    • GEM Traps
    • VAF Filters
  • Resources
  • Contact